PROJECT UPDATES

On an area of more than two square kilometers, 40 towers are reaching for the sky. Run by 29 of the world’s top hospitality service providers, the hotel rooms and suites in these towers will host some 34,000 guests on any normal day, and up to a whopping 100,000 visitors on any given day during the Haj and Umra seasons. The standout features of the project are a pair of twin towers with a praying area directly connected with The Holy Mosque. Together, they boost pedestrian traffic along King Abdulaziz Road, which leads straight to the Haram, and provide a comprehensive set of shops and restaurants.

PROJECT PHASES
ROAD A ROAD D JABAL OMAR ROAD RADIAL SPINE Umm AL-Qura Road Ibrahim Al Khalil St. 1 1 1 1 3 3 2 4 4 4 5 5 5 6 7 7 7
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
PHASE 7
PHASE 1

This phase consists of 4 structural bases accommodating 10 hospitality and residential towers in addition to 10 Luxurious Penthouses, commercial spaces with a total built area of 21.572 square meters served with 457 parking spaces. The total construction area for the first phase is about 520,718 square meters. This phase was launched during the first quarter of 2017 in the presence of the Advisor to the Custodian of the Two Grand Mosques and The Prince of Makkah Prince Khalid Al-Faisal.

PHASE 2

This phase consists of a single structural base, Accommodating 4 hospitality towers with a view of Ibrahim Al-Khalil Street and a total building area of 200 thousand square meters. The base Building consists of 3 commercial floors, 96 residential units, 4 villas, and 3 parking floors, enriched by all sorts of services outlets and halls such as restaurants, meeting rooms, and Gyms. Construction of the second stage is set to be completed by the end of the fourth quarter of 2018.

PHASE 3

The third phase consists of two construction bases and four towers with a total built area of 398 thousand square meters. This phase includes 2166 hotel rooms comprising the twin towers, 1490 hotel rooms of which will be managed by Address Hotels & Resorts. Construction of the third stage is set to be completed by the end of the first quarter of 2019.

PHASE 4

The fourth phase consists of three structural bases accommodating seven hotel towers, as well as a facility equipped with all the essential services dedicated to government agencies and located at the center of the project. The total construction area for this phase is 320,000 square meters. Construction of this phase is set to be completed in the fourth quarter of 2018.

PHASE 5

The total construction area of the fifth and sixth phases were increased from 363,691 square meters to 718,637 square meters.

PHASE 6

The total construction area of the fifth and sixth phases were increased from 363,691 square meters to 718,637 square meters.

PHASE 7

The seventh Phase is located on a distinct area of the project which overlooks the Grand Mosque directly through its three main facades facing the Grand Mosque and its arenas. This phase was divided into three areas with a total built area of about 387,603 square meters, one of which is a seven-star hotel and the other two are built as a five-star residential units. This includes a public praying area with a capacity to accommodate up to 30,000 people, and work is underway to make one of the main landmarks of Makkah and the Kingdom out of this spectacular and premium phase.

Open form